Freeze the specification before confirming quantity
A hotel door lock bulk order checklist should describe exactly what will arrive at the hotel. A model name and total quantity are not enough when doors have different handing, thickness or mortises. Start with a door schedule linking each room or door group to the approved configuration.
Record finish, reader type, access methods, lock body, accessories and the drawing revision. If more than one configuration is needed, give each a distinct line item.

Approve one complete working sample
Test a sample with the intended cards, encoder and software on a representative door. Confirm the appearance in normal lighting, inside operation, strike alignment and agreed emergency access process. Resolve any sample changes in writing before bulk production.
Keep photographs and a configuration record of the approved sample. A later change in finish, mortise or electronics should trigger a compatibility review rather than being treated as a cosmetic substitution.
Count accessories and supporting equipment
Specify screws, spindles, cylinders or keys where applicable, strikes, plates, cards, encoders, gateways and the agreed spares. Confirm whether batteries are included and whether shipping arrangements affect battery supply.
For software, identify the version, registration process, licence terms, required computer environment and handover information. List training and installation documentation in the order scope.

Agree inspection and packaging records
The packing photos illustrate cartons and an unpacked component set. Use your own order list to confirm carton contents rather than assuming the photo defines a standard package. Ask how items are labelled by model, finish and handing so installers can distribute them correctly.
Agree the inspection evidence required for the order: appearance, function, quantities and any documented test results. Certifications must apply to the actual supplied product and required market; a generic logo is not a substitute for valid evidence.
Separate commercial and delivery responsibilities
Confirm quotation validity, payment milestones, production schedule, delivery terms and responsibility for transport and import costs. Record warranty coverage, exclusions, spare supply and the process for reporting an arrival discrepancy.
Check carton count and visible damage at receipt. Reconcile the delivery against the packing list before distributing components across floors, and keep the model labels available for installation and future service.
Final release questions
Does the order match the approved sample? Are all door groups covered? Is the software handover complete? Are spares and accessories counted? Is the receiving team ready to inspect the shipment?
Send DELUNS a room schedule and door photos with your inquiry so a project quotation can be based on the complete scope.
Related DELUNS resources
Review our hotel lock system overview and RFID hotel door lock selection guide. For installation planning, see hotel lock project services.
Contact DELUNS with your door photos, room quantity and required access workflow for a configuration discussion.



